TBM hires engineering firm for wastewater treatment plant expansion - Collingwood News

2021-12-25 08:51:54 By : Ms. Leslie W

NEWS RELEASE TOWN OF THE BLUE MOUNTAINS **************************

The Town of The Blue Mountains would like to advise residents that the IBI Group has been awarded the engineering contract for the Thornbury Wastewater Treatment Plant Expansion 1A.

The IBI Group has provided engineering and construction services for many similar wastewater treatment plants throughout Ontario. Their expertise includes planning, hydraulic analysis and modeling, environmental assessment, wastewater and water treatment facilities design, linear infrastructure, and land development engineering.

This project will include the design and construction of the equipment required to increase the plant’s capacity to 5,330 m3/day, from its current capacity of 3,580 m3/day. It will also result in greater energy efficiency by providing the systems that will allow the plant to scale its operations in conjunction with peak daily demand periods.

Phase 1A of the Thornbury Wastewater Treatment Plant Expansion will include:

“The expansion of the Thornbury Wastewater Treatment Plant is a key project for the municipality,” says Shawn Carey, Director of Operations. “The work being completed will ensure the plant is capable of providing reliable service to our community for years to come, while also maximizing the facility’s energy efficiency.”

Expansion of the plant was approved as part of the 2020 Town Budget. The detailed design is scheduled to be finalized in mid to late 2022, with construction to be completed in two steps. The project is expected to be completed by the end of 2024.

To learn more about the project and to subscribe for project updates, please visit the Town’s project page at: www.thebluemountains.ca/TWWTPExpansion1A